# Creating and configuring plans

> A plan needs four things. A frequency, a scope of controls or assets, a task description, and a workflow. How to set each one up and update it afterwards.

Source: https://tidalcontrol.com/docs/plans/creating-and-configuring-plans

A plan is the schedule that generates your recurring compliance tasks. Setting one up takes four things: a frequency, a scope of controls or assets, a task description, and activation. It generates nothing until all four are in place.

## Adding new plans

Creating a plan sets its name and frequency. Scope, workflow, and activation all come afterwards.

### Creating a plan

Creating a new plan starts with basic configuration that determines automatic task generation.

**Plan creation steps:**
1. **Click "Add plan" button** in the top right of Plans overview
2. **Plan creation dialog opens** with basic configuration fields
3. **Fill in plan information** according to your compliance needs
4. **Click "Create"** to create the plan

![Creating new plan](/images/help/plans_add_plan.png)

### Filling in basic plan information

Only a name and frequency are required to create a plan.

**Required fields:**

**Name:**
- **Clear description** of compliance cycle
- **Tip: Add PDCA phase and frequency** for structure
- **Examples:** "Plan phase (annually)", "Check phase (quarterly)", "Monthly access reviews"

**Frequency:**
- **Daily** - For operational monitoring
- **Weekly** - Regular operational controls  
- **Monthly** - Standard compliance reviews
- **Quarterly** - Strategic assessments
- **Semiannually** - Strategic assessments
- **Annually** - Management reviews and planning

**Valid From:**
- **Start date** for automatic task generation
- **Default:** "Today's date" to activate the new plan immediately
- **Use:** Set to future date when implementation is phased

**Valid To (optional):**
- **End date** for plan cycle
- **Default:** "Not set" for continuous cycles
- **Use:** For project-bound compliance or temporary cycles

> **warning:**

**Important:** Valid From and Frequency cannot be changed after the plan is created. Plan these carefully for optimal timing.

## Configuring plan details

After your plan is created, you can adjust basic information and create the workflow to activate the plan.

![Plan workflow configuration](/images/help/plans_details.png)

### Updating plan basic information

- **Name** - Can be changed after creation
- **Custom ID** - Optional unique identifier (e.g. P.01)
- **Valid From/To** - Only Valid To can be changed
- **Frequency** - Not changeable after creation
- **Description** - Description of plan purpose

## Configuring Plan Workflow

After plan details are filled in, configure automatic task generation via "Build workflow".

### Setting up workflow

![Workflow configuration](/images/help/plans_add_task.png)

**Task configuration steps:**

**Selecting task type:**
- **Ask users to** dropdown - Choose what users should do. If you choose 'Assess the control' the Plan will create an Assessment task. In all other cases the Plan will create an Execution task.
- **Execute the control** - Default option for control implementation
- Other options available for different task types

> **tip:**

Leave this field on default and use other task types ONLY if you plan to create a complex workflow with multiple steps.

**Timing configuration:**
- **Create tasks on** - When tasks are created (e.g. 1-9-2025)
- **Their due date is on** - Deadline for completion (e.g. 28-2-2026)
- **Time between creation and deadline** determines how much time teams get

**Writing task instructions:**

Each Plan automatically adds the Control and/or Asset description to generated tasks.

Additionally, via the 'Task instructions' it's possible to add one **additional** instruction to **all** tasks created by the Plan.

- **Write tab** - Use (markdown) editor for detailed instructions
- **Preview tab** - Check how instructions look
- **Markdown support** - Use headings, lists and links for clarity
- **Write specific instructions** - Describe exactly what needs to happen

**Task instructions template:**
```
### What needs to be done

[Describe concrete steps]

### Required information

[What data is needed]

### Expected result

[What is the desired outcome]

### Evidence

[Which documents to upload]
```

> **warning:**

The task instructions are additional instructions added to **all** tasks created by this Plan.

**Completing workflow:**
1. **Click "Add task"** to add a new task to the workflow
2. **Repeat process** for different task types if needed
3. **Preview section** shows when tasks are automatically sent
4. **Check timing** - Start date, due date and execution time

> **tip:**

**Realistic deadlines**: Ensure sufficient time between task creation and due date. Teams need time for planning and execution.

## Defining plan scope

The scope decides which items the plan generates tasks for. You pick either controls or assets, not both.

### Scope configuration options

After basic configuration, define which items are automatically controlled by this plan.

**Two scope methods:**
- **Plan by Controls** - Focus on control implementations
- **Plan by Assets** - Focus on business assets

### Plan by Controls

Scope by controls when you're checking effectiveness against a framework or a policy, not a specific system.

**When to use controls scope:**
- Assess control effectiveness
- Framework compliance (ISO 27001, SOC 2)
- Check policy compliance
- Conduct process evaluations

**Selecting controls:**
1. **Go to Scope tab** in plan details
2. **Select "Plan by Controls" tab**
3. **Select controls** that belong in this cycle
4. **Check for inactive Controls** - tasks are only created for Controls that are themselves also active

![Plan by Controls scope](/images/help/plans_scope_controls.png)

**Controls scope example:**
```
Annual ISMS planning:
✓ A.01 Context of the organisation documented
✓ A.02 Legal and contractual requirements identified  
✓ A.03 Scope of the ISMS determined
✓ A.05 Roles and responsibilities defined
```

### Plan by Assets

Scope by assets when the review is really about a specific system, vendor, or business unit.

**When to use assets scope:**
- Technology assessments
- Vendor evaluations  
- Infrastructure reviews
- Business unit reviews

**Selecting assets:**
1. **Go to Scope tab** in plan details
2. **Select "Plan by Assets" tab**
3. **Select assets** that belong in this cycle
4. **Check for inactive Assets** - tasks are only created for Assets that are themselves also active

![Plan by Assets scope](/images/help/plans_scope_assets.png)

**Assets scope example:**
```
Quarterly cloud security review:
✓ Microsoft Azure Cloud (SYS.001)
✓ AWS (SYS.002) 
✓ Public website (SYS.003)
✓ 1Password (SYS.004)
```

## Plan preview and validation

The preview shows the tasks the plan would generate over the coming period, which is the fastest way to catch a scope mistake before activating.

### Using preview functionality

Check when tasks are automatically generated over the coming period.

![Plan preview timeline](/images/help/plans_preview.png)

**Understanding preview information:**
- **Task** - Type of task generated (Execution or Assessment)
- **Period** - The period for which tasks are created
- **Start date** - When tasks become available
- **Due date** - Deadline for completion
- **Time to execute** - Time between start and deadline
- **Number of tasks** - How many tasks per cycle (corresponds to number of unique control-assets combinations)

### Plan status verification

Four status checks on the right tell you whether the plan is actually valid and ready to activate.

**Status indicators on the right:**
- **Details: ✅ Plan is valid** - when current date falls within validity period
- **Workflow: ✅ Tasks configured** - At least one workflow task configured with valid start and end date
- **Scope: ✅ Controls / Assets assigned** - At least one scope object linked.
- **Scope: ✅ All assigned Controls / Assets are active** - Each linked scope object is itself also active.

**Status troubleshooting:**
- **⚠️ Plan is currently not valid** - Set 'Valid to' date in the future
- **⚠️ Plan has no tasks configured** - Configure at least one task in the Workflow builder.
- **⚠️ Plan has no assets assigned** - Select at least one control or asset
- **⚠️ Not all assigned controls are active** - Activate controls or remove from scope  

## Practical configuration tips

Two choices decide whether a plan helps or drowns you: how often it runs, and when in the period it lands.

### Frequency selection

**Start by assigning law and regulation driven activities:**
- **ISO 27001** - Management review annually, risk assessment quarterly
- **GDPR** - Processing records periodic assessment, annual review of impact assessments
- **SOC 2** - Control testing quarterly, management review annually

**Add risk-based activities:**
- **High risk** - Monthly or weekly
- **Medium risk** - Quarterly assessments
- **Low risk** - Annual reviews

### Timing optimisation

Spread plans across the quarter rather than the first month, and avoid the December/January period entirely.

**Workload distribution:**
- **Avoid December/January** - Holidays and vacation
- **Spread over quarter** - Not everything in first month
- **Concurrent capacity** - How many plans simultaneously?
- **Team availability** - Who does what when?

## Common configuration problems

Almost every plan complaint is one of these two: the plan will not activate, or it activates but produces nothing.

### Plan remains inactive

An empty scope, a future start date, or a missing workflow are the three usual causes.

**Possible causes:**
- **Empty scope** - No controls or assets selected
- **Future start date** - Valid From still in the future
- **Missing workflow** - Tasks not configured
- **Owner problems** - Scope items without responsible persons

**Solution steps:**
1. **Check scope tabs** - At least one item selected?
2. **Verify Valid From** - Date is today or earlier?
3. **Review owners** - All scope items assigned?
4. **Configure workflow** - Tasks set up for automation?

### Preview shows no or 0 tasks

Check the scope, the Valid From date, and whether the linked controls or assets are themselves active.

**Diagnosis checklist:**
- **Scope definition** - Items selected in scope?
- **Date configuration** - Valid From not too far in future?
- **Controls and Assets active** - Check in Scope tab if controls and assets are active

## Plan activation workflow

A plan only starts generating tasks once every part of it is complete.

### Activation checklist

For automatic task generation everything must be complete:

- ☐ **Basic configuration** - Name, frequency, dates filled in
- ☐ **Scope defined** - Controls or assets selected 
- ☐ **Scope activated** - Controls or assets must themselves also be Active 
- ☐ **Workflow configured** - Task automation set up
- ☐ **Preview checked** - Timeline matches expectations

## Next steps

Now that you can create and configure plans:
- **Start with one pilot plan** for known compliance cycle
- **Configure task workflow** for automatic execution
- **Monitor first task generation** and team reactions
- **Optimise scope and timing** based on practical experience
